Case Study: Sports Club Pavilion Flooring | Hampshire
Case Study: Sports Club Pavilion & Changing Room Flooring
Modern changing facilities with drainage matting providing safe, hygienic flooring
When this thriving multi-sport club undertook a major pavilion refurbishment, changing room flooring was a top priority. With football, rugby, and cricket teams generating over 500 weekly users, the existing tiled floors had become a safety hazard — cracked grout harboured bacteria whilst wet surfaces caused regular slip incidents.
This case study documents how comprehensive rubber drainage flooring transformed their facilities, eliminating slip incidents and achieving top marks in their sports facility inspection.
Project Overview
| Facility | Multi-Sport Club Pavilion, Hampshire |
| Sports | Football, Rugby, Cricket — 12 teams, 500+ weekly users |
| Challenge | Worn tile floors causing slip hazards and hygiene issues |
| Solution | Drainage matting in wet areas, entrance matting, anti-fatigue in bar |
| Floor Area | 340m² (changing 180m², showers 60m², entrance 40m², pool area 60m²) |
| Installation | 5 days (during summer close season) |
| Products | Open Ring Drainage Mats, Interlocking Link Mats, Entrance Matting |
| Investment | £11,200 (15-year projected lifespan) |
The Challenge: High Traffic, Wet Conditions, Multiple Sports
Sports club changing rooms face unique flooring challenges that intensify with each match day:
- Peak traffic: 30+ players simultaneously after Saturday fixtures creates extreme wet conditions
- Mud and debris: Football and rugby players bring significant soil into changing areas
- Barefoot safety: Players walk barefoot between lockers and showers on wet surfaces
- Rapid turnaround: Multiple teams may use facilities within hours, requiring quick-dry floors
- Hygiene standards: Athlete's foot and other infections spread rapidly on porous surfaces
According to Sport England facility guidance, changing room floors must provide "slip resistance when wet, easy cleaning, and rapid drainage." The club's existing ceramic tiles failed on all counts.
The Shower Area Solution
Interlocking drainage mats in the shower area allow water to drain instantly whilst providing secure barefoot grip
The communal shower area demanded the highest specification flooring — constant water flow, barefoot traffic, and the need for thorough daily disinfection. The interlocking rubber link mat system addresses these challenges:
| Feature | Function | Benefit |
|---|---|---|
| 16mm interlocking tiles | Seamless coverage | No gaps for bacteria, easy to extend |
| Large drainage holes | Immediate water flow-through | No standing water even during peak use |
| Raised surface pattern | Barefoot grip when wet | Confident footing for all users |
| Non-porous rubber | Prevents absorption | Full hygiene with standard disinfection |
Pavilion Entrance
Heavy-duty entrance matting captures mud and moisture before it reaches changing areas
The pavilion entrance serves as the first line of defence against mud and debris. Players arrive directly from pitches with boots caked in soil — particularly after winter rugby and football matches. The entrance matting system provides:
- 4m depth coverage: Multiple footsteps to remove majority of soil
- Aggressive scraping: Ribbed surface dislodges compacted mud from boot studs
- High moisture absorption: Traps water from wet weather and pitch irrigation
- Boot brush integration: Mounted brushes for stud cleaning before entry
Pool Area Drainage
Drainage matting around the club's training pool provides safe walking surfaces for swimmers
The club's 15m training pool required specialist poolside flooring to handle constant splash-out and barefoot traffic. Open ring drainage matting was specified for the pool surround, providing:
- Immediate drainage of pool water back to deck drains
- Secure grip for wet barefoot walking
- Cushioned surface for comfort during poolside warm-ups
- Resistance to chlorinated water and pool chemicals
The transformation has been remarkable. We used to dread the post-match clean-up, especially after rugby in winter. Now we hose down the changing rooms in 20 minutes and they're ready for the next team. More importantly, we haven't had a single slip incident since installation.
Products Used in This Project
Slip-Not Products Specified
- Extra Heavy-Duty Open Ring Drainage Matting — 180m² for changing rooms and pool area
- Heavy-Duty Interlocking Link Mats — 60m² for shower areas
- Commercial Grade Ridge Entrance Matting — 40m² at pavilion entrance
- Anti-Fatigue PVC Sponge Mat — Behind bar service area
Measurable Results After 12 Months
The completed facility provides safe, hygienic changing facilities for all club members
| Metric | Before | After | Improvement |
|---|---|---|---|
| Slip incidents (annual) | 11 | 0 | 100% elimination |
| Post-match cleaning time | 90 minutes | 45 minutes | 50% reduction |
| Hygiene inspection score | 68% | 94% | +26 points |
| Member satisfaction (facilities) | 3.1/5 | 4.6/5 | 48% improvement |
| Athlete's foot complaints | Regular | None reported | Eliminated |
Frequently Asked Questions
Upgrade Your Sports Facility
Ready to Transform Your Changing Rooms?
From local clubs to professional facilities, our drainage and entrance matting solutions are trusted across UK sport. Contact us for a free site assessment and quotation.
Browse Drainage MattingOr call us: 01744 520110 · Free UK delivery on orders over £50
Project completed August 2025. Photography with permission. Results based on 12-month review. Individual results may vary.
Related Case Studies: Swimming Pool · Commercial Gym · School Playground
